Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 84 results ...

Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability, Unpublished PhD Thesis, , University of Florida.

Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers, Unpublished PhD Thesis, , University of Florida.

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects, Unpublished PhD Thesis, , University of Florida.

Alkhard, A (2016) Analysis of influencing factors on safety culture in the construction industry of Saudi Arabia, Unpublished PhD Thesis, , University of Florida.

Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements, Unpublished PhD Thesis, , University of Florida.

Bentil, K K (1990) A model approach for predicting commercial construction site accidents, Unpublished PhD Thesis, , University of Florida.

Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management, Unpublished PhD Thesis, , University of Florida.

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation, Unpublished PhD Thesis, , University of Florida.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project, Unpublished PhD Thesis, , University of Florida.

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy, Unpublished PhD Thesis, , University of Florida.

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process, Unpublished PhD Thesis, , University of Florida.

Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory, Unpublished PhD Thesis, , University of Florida.

Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services, Unpublished PhD Thesis, , University of Florida.

Dib, H Y (2006) Visual information access and management for life cycle project management, Unpublished PhD Thesis, , University of Florida.

Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations, Unpublished PhD Thesis, , University of Florida.

El-Assaly, A E E-D (1997) Development of a statistical/mechanistic model to predict the consumption of nonrenewable materials in highway construction programs, Unpublished PhD Thesis, , University of Florida.

El-Mashaleh, M S (2003) Firm performance and information technology utilization in the construction industry: An empirical study, Unpublished PhD Thesis, , University of Florida.

Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones, Unpublished PhD Thesis, , University of Florida.

Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology, Unpublished PhD Thesis, , University of Florida.

Ellis, R D, Jr. (1989) Model for prediction of highway construction production rates, Unpublished PhD Thesis, , University of Florida.

Emmer, M J (2009) A decision process model for closing the structural steel materials loop in construction, Unpublished PhD Thesis, , University of Florida.

Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry, Unpublished PhD Thesis, , University of Florida.

Fetterhoff, O G, III (2004) Comparative evaluation of strategic construction-market forecasting methodologies, Unpublished PhD Thesis, , University of Florida.

Forcael, E (2010) Buffering strategies for managing transportation construction projects, Unpublished PhD Thesis, , University of Florida.

Godfrey, R J (2007) Analysis of construction worker injury information from a workers' compensation database, Unpublished PhD Thesis, , University of Florida.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects, Unpublished PhD Thesis, , University of Florida.

Guo, K (2006) Risk of pavement warranties to contractors, Unpublished PhD Thesis, , University of Florida.

Haidar, A (2011) Analysis and optimization of megaproject performance, Unpublished PhD Thesis, , University of Florida.

Harris, M A (2007) Developing a scorecard to evaluate the use of personal fall arrest systems, Unpublished PhD Thesis, , University of Florida.

Haupt, T C (2001) The performance approach to construction worker safety and health, Unpublished PhD Thesis, , University of Florida.

Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment, Unpublished PhD Thesis, , University of Florida.

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction, Unpublished PhD Thesis, , University of Florida.

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates, Unpublished PhD Thesis, , University of Florida.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm, Unpublished PhD Thesis, , University of Florida.

Kim, S J (2009) Identification of construction project problems and their impacts on project success, Unpublished PhD Thesis, , University of Florida.

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction, Unpublished PhD Thesis, , University of Florida.

Languell, J L (2001) Development of a prototype assessment tool to evaluate the potential to successfully implement deconstruction as a regional waste reduction strategy, Unpublished PhD Thesis, , University of Florida.

Lee, J (2008) Dynamic project management methodology: Managing schedule compression, Unpublished PhD Thesis, , University of Florida.

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations, Unpublished PhD Thesis, , University of Florida.

Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method, Unpublished PhD Thesis, , University of Florida.

Liu, W (2008) Systems theory based method for construction project planning, Unpublished PhD Thesis, , University of Florida.

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida, Unpublished PhD Thesis, , University of Florida.

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction, Unpublished PhD Thesis, , University of Florida.

Malone, E K (2010) Work-life balance and organizational commitment of women in construction in the United States, Unpublished PhD Thesis, , University of Florida.

Mutis-Sin, I A (2007) Framework for interpretation of construction concept representations, Unpublished PhD Thesis, , University of Florida.

Niu, J (2014) Ontology-based semantic interpretation framework for legal analysis of construction claims, Unpublished PhD Thesis, , University of Florida.

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings, Unpublished PhD Thesis, , University of Florida.

Ohland, M W (1996) Engineering by design: A methodology for designing creative engineering activities, Unpublished PhD Thesis, , University of Florida.

Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures, Unpublished PhD Thesis, , University of Florida.

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance, Unpublished PhD Thesis, , University of Florida.

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component, Unpublished PhD Thesis, , University of Florida.

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared, Unpublished PhD Thesis, , University of Florida.

Raheem, A A (2014) Developing a framework for a reciprocal safety implementation system (RSIS) in the pakistani construction industry, Unpublished PhD Thesis, , University of Florida.

Razkenari, M A (2019) Framework for measuring industrialized construction maturity, Unpublished PhD Thesis, , University of Florida.

Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador, Unpublished PhD Thesis, , University of Florida.

Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning, Unpublished PhD Thesis, , University of Florida.

Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments, Unpublished PhD Thesis, , University of Florida.

Shanbari, H A (2016) Evaluating the use of video games in construction management education, Unpublished PhD Thesis, , University of Florida.

Shi, W (2009) Framework for integration of BIM and RFID in steel construction, Unpublished PhD Thesis, , University of Florida.

Shi, Y (2020) A working memory investigation of immersive visualization technologies on construction task performance, Unpublished PhD Thesis, , University of Florida.

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study, Unpublished PhD Thesis, , University of Florida.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective, Unpublished PhD Thesis, , University of Florida.

Smith, D J (2003) Ecological effects of roads: Theory, analysis, management, and planning considerations, Unpublished PhD Thesis, , University of Florida.

Soares, R (1999) User cost customization for a Florida bridge management system, Unpublished PhD Thesis, , University of Florida.

Stevens, M S (2012) Impact of key management practices on overhead to direct cost ratio for specialty construction contractors, Unpublished PhD Thesis, , University of Florida.

Suarez, J J (2004) A neural network model to predict business failure in construction companies, in the United States of America, Unpublished PhD Thesis, , University of Florida.

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction, Unpublished PhD Thesis, , University of Florida.

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information, Unpublished PhD Thesis, , University of Florida.

Terouhid, S A (2013) A dynamic decision support system for organizational sustainability excellence of construction firms, Unpublished PhD Thesis, , University of Florida.

Tian, Y (2022) Financing infrastructure through blockchain tokenization, Unpublished PhD Thesis, , University of Florida.

Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction, Unpublished PhD Thesis, , University of Florida.

Wang, Y (2015) Structured versus direct-mapping approaches to empirical modeling of civil engineering problems, Unpublished PhD Thesis, , University of Florida.

Wao, J O (2014) Value engineering methodology to improve building sustainability outcomes, Unpublished PhD Thesis, , University of Florida.

Wehle, A J (2014) Taxonometric model for using leading safety indicators in the construction industry, Unpublished PhD Thesis, , University of Florida.

Westmoreland, G (1979) Electric utilities' accounting for construction work in progress the effects of alternative methods on the financial statements, utility rates and market to book ratio, Unpublished PhD Thesis, , University of Florida.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity, Unpublished PhD Thesis, , University of Florida.

Whiteman, D E (2002) The application of total quality management in construction field operations, Unpublished PhD Thesis, , University of Florida.

Xie, H (2005) User model-driven architecture for information retrieval in construction project management, Unpublished PhD Thesis, , University of Florida.

Zhang, L (2012) Ontology-based web services framework for building information modeling, Unpublished PhD Thesis, , University of Florida.

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing, Unpublished PhD Thesis, , University of Florida.

  • Type: Thesis
  • Keywords: decision support; duration; precast concrete; decision making; forecasting; manpower; manufacturing; off-site construction; productivity; programming; Monte Carlo simulation; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2650272885
  • Abstract:
    The application of three-dimensional (3D) printing is a heated discussion in the construction industry. The automatic and accurate printing process not only helps reduce manpower and waste but also increases the productivity and project quality in construction. However, the high capital cost is the main barrier to adopting this new technology for companies in this cost-sensitive industry. Forecasting the performance of 3D printing during the design phase can support companies’ decision making on the issue. In this research, a stochastic model was developed to simulate the implementation of 3D printing in on-site and off-site construction. This paper first identifies the influential factors in the two different construction modes. By assuming the arrival of projects using Poisson distribution and the time interval between projects using a negative exponential distribution, a project stream generator for construction companies was developed based on queuing theory. The Excel Visual Basic programming language was adopted to execute the iteration of a Monte Carlo simulation. Data collected from precast concrete parking structure projects were used as the baseline of sensitivity analysis. Then, a sensitivity analysis was conducted to help the companies select the optimal construction strategies in different situations. By using the baseline value as the input of the model, the significant factors were identified as the number of printers, the number of projects, and the duration of printers’ remobilization and the insensitive factors were the duration of components’ transportation, variance of components’ erection and variance of components’ manufacturing hours. Further research will consider economic performance of 3D printers and uncertainties in the two modes.

Zhou, T (2023) Embodied robot teleoperation in construction, Unpublished PhD Thesis, , University of Florida.

Zhu, Q (2022) Haptic interaction for human-robot shared perception in construction, Unpublished PhD Thesis, , University of Florida.

Zhu, Y (1999) Web-based construction document processing through a "malleable frame", Unpublished PhD Thesis, School of Building Construction, University of Florida.

Zuppa, D (2009) Model for developing trust in construction management, Unpublished PhD Thesis, , University of Florida.